CURRENT RATES                                                                                        


Residential/Commercial Facilities (single-family residence, convenience store, office building, etc.) 

Base Administrative Fee/Meter $15.00     plus usage rate below
Block 1 (0 to 5000) gallons $ 7.00 per 1000 gallons
Block 2 (5001 to 8000) gallons $ 8.50 per 1000 gallons
Block 3 (over 8000) gallons $10.00 per 1000 gallons

Multi-Unit Residential Complexes (apartments, condominiums, etc.)

Administrative Fee/Meter     $15.00 plus usage rate below  
Block 1 (0 to 5000) gallons $ 7.00 per 1000 gallons
Block 2 (5001 to 8000) gallons $ 8.50 per 1000 gallons
Block 3 (over 8000) gallons         $10.00 per 1000 gallons

Non-Residential-Industrial Production (manufacturing facility using water for production, poultry farms, nurseries, etc.)

Administrative Fee/Meter $15.00 plus usage rate below
0 gallons and over     $  4.57 per 1000 gallons

Click here for print version of rate schedule.

OTHER FEES                                                                                               

                    Description             Charge
Water Deposit:
    Owner         $      40.00
    Renter $      80.00    
Late Fee $        5.00 
Reconnection Fee $      35.00    
Returned Check Fee $      25.00        
Tap Fee (3/4") $ 1,000.00
Split Irrigation Tap (existing service) $ 1,000.00
Meter Installation Fee $    200.00
Hydrant Fee $      50.00 
Hydrant Deposit (Refundable) $ 1,000.00
Sewer Tap (Long Service)         $ 1,700.00
Sewer Tap (Short Service)         $    850.00
Theft/Tampering/Vandalism $    500.00    
Bacteriological Samples $      35.00
Inspection Fees $      45.00 per hour 
Design/Plan Review $      60.00 per hour
Consulting Engineer:
    Design Review $    120.00 per hour    
    Inspection $      55.00 per hour
Meter Test     $      35.00
Chatham County Specifications Book $      20.00

Connection Charges                                                                                   

Meter Size, Maximum Flow and Fees

 Meter
Size

Meter
Capacity 

Availability Fee 

Tap Fee (1) 

5/8x3/4"   

20 gpm

$    3,500 per unit    

$1000 

1"

50 gpm 

$    7,000 per unit 

Actual Cost 

1 1/2"

100 gpm

$  10,000 per unit 

Actual Cost

2"

160 gpm 

$  16,000 per unit 

Actual Cost 

3"

350 gpm

$  30,000 per unit

Actual Cost

4"

630 gpm

$  40,000 per unit

Actual Cost

6"                

1,500 gpm     

$120,000 per unit        

Actual Cost

Source of maximum flow data is American Water Works Association

 (1)In cases when developer installs meter box, customer shall be charged a meter installation fee consistent with the County's prevailing rate at the time of connection.

Notes: 

        1.  For meter size larger than 3/4 inch, the customer will pay the availability fee
             and will be billed separately for the actual cost of the tap (supplies and 
             material) 

        2.  Multi-Unit Residential, Commercial, Industrial users served through one meter: 
             Availability Fees shall be charged based on a per unit charge or the 
             Connection Charge for the bulk meter whichever is greater. 

        3.  Meter sizes and type shall be approved/determined by the Chatham County 
             Utilities Department. 

 Click here for printer version of connection charges.  

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer